New England Motor Sports Museum

News


The Building Arrives!
04/29/2016
The Building Arrives!

The components that will make up the North East Motor Sports Museum have arrived. Three trailer trucks loaded with trusses, the metal that will make up the roof and exterior walls, insulation, and lumber rolled into New Hampshire Motor Speedway on Wednesday, April 27, 2016. That same morning, a crew from Kendall Construction and another from Bentley Warren Inc including Bentley himself prepared the area inside the foundation for the pouring of the 5" thick concrete floor.



Back